Blog

pioneering spirit vessel

Pioneering Spirit has safely removed the QP accommodation platform topsides and connecting bridge from the Aker BP-operated Valhall field in the southern Norwegian North Sea. [8], The emphasis switched from the conversion of two existing tankers to a new-build hull in 2004, though retaining the catamaran concept. PHOTO SOURCE: Spirit Energy Final preparations … [15], Allseas eventually was able to sign the main construction contract in June 2010 with South Korean shipyard Daewoo Shipbuilding & Marine Engineering Co Ltd.[16]. Platform preparations were scheduled to begin later in 2020 and continuing into the 2021 lift season. She is scheduled to remove the remaining two Brent field topsides for Shell, the 15,000 tonne Brent Alpha and 29,500 tonne Brent Charlie. Eight diesel generators provide 95 M… The Stinger is curved to guide the pipe to the bottom of the ocean. In 2005 Vuyk is contracted by Allseas to assist in performing the structural design of the decommissioning vessel Pioneering Spirit (Pieter Schelte). On 28 April 2017 Pioneering Spirit performed the single-lift removal of Shell's 24,200-tonne (26,700-short-ton) Brent Delta topsides. PIONEERING SPIRIT Current Position (Other Type, MMSI: 249110000, IMO: 9593505) - MyShipTracking. How does it work? The vessel PIONEERING SPIRIT (IMO: 9593505, MMSI: 249110000) is a Other Type It's sailing under the flag of [MT] Malta. Systems and parts of the new Jacket Lift System are taking form at fabrication sites around the world. [37], She has installed three out of four platform topsides for phase one of the Johan Sverdrup development in offshore Norway. After foundation piles are cut near the seabed, hoisting blocks are lowered from two towering main beams and connected to hooks on the top of the jacket. The Pioneering Spirit construction vessel, above, will remove Spirit Energy platforms DP3 and DP4. 1. Allseas’ heavy lift vessel Pioneering Spirit has completed its first decommissioning job of this summer, the single-lift removal of Shell’s Brent Alpha platform from the North Sea. This structure was an accommodation platform in Valhall field, located in southern part of North Sea about 280km off the Norwegian coast. The vessel's maximum speed is 14 knots (26 km/h; 16 mph). Water depth at the field is approximately 70 meters. Pioneering Spirit performed her first commercial lift, removal of Repsol's 13,500-tonne (14,900-short-ton) Yme mobile offshore production unit (MOPU) on 22 August 2016. After straddling the payload, Pioneering Spirit takes o… Put simply, jackets are lifted over the stern of the vessel. Allseas developed the original idea to include steel jacket installation, jackets and topsides removal and rigid pipelay capabilities. After several months of preparatory works in Rotterdam, Pioneering Spirit is back where she belongs, in open water. As per update on July 2019, Allseas is planning to upgrade the lift capacity from 48,000 tonnes to 60,000 tonnes. The decision to remove the platform was made in 2013, and the contract for the removal of the topsides was subsequently awarded to Allseas. The vessel PIONEERING SPIRIT (IMO: 9593505, MMSI 249110000) is a Crane Ship built in 2014 (6 years old) and currently sailing under the flag of Malta . The current position of PIONEERING SPIRIT is in North Sea with coordinates 51.96100° / 3.97700° as reported on 2020-11-23 20:04 by AIS to our vessel tracker app. [26] A 5,000 tonnes (5,500 short tons) special purpose crane built by Huisman is scheduled for delivery in the second half of 2018. [6], The initial concept, by Allseas technical director W.P. News for PIONEERING SPIRIT First voyage of the Pioneering Spirit Aug. 8, 2016 at 12:14 by Julia Rudolph in General. Pioneering Spirit, North Sea Maritime | Internet Connectivity With gross tonnage measuring in at 403,342 GT and a lifting capacity of 48,000 tons, the Pioneering Spirit is by far the world’s largest crane vessel. A ship can change name and flag state through time, but the IMO number remains the same through the hull's entire lifetime. (Aug 4, 2020) Pioneering Spirit Removes Tyra East Alpha (Jul 9, 2020) Boluda Towage Europe assists the Pioneering Spirit, the world’s largest vessel by gross tonnage, in Great Britain (Jun 22, 2020) Spotted: Pioneering Spirit removes third platform from Brent field [2][33] Located in the Brent field, approximately 186 km (100 nautical miles) off the northeast coast of Shetland, the iconic platform sat on a three-legged gravity-based structure in 140 m (460 ft) of water. For removal of topsides, the vessel straddles the intended payload with the slot formed by the twin bows. [29] It is attached to the Stinger Transition Frame (STF), which provides an interface between the Stinger and the vessel; the STF is installed in the bow slot when attached to the vessel. Deltamarin was awarded a contract to provide detailed design covering naval architecture, structural and system engineering, as well as accommodation of the Pioneering Spirit in February 2010. [35][36] Starting from the Russian coast near the town of Anapa, the 930-kilometre (580 mi), 80-centimetre (32 in) diameter twin-pipeline will traverse the Black Sea at depths up to 2,200 m (7,200 ft) and emerge onshore in Turkey's Thrace region. Pioneering Spirit’s large ship size gives her very good wave response behaviour, superior to semi-submersible crane vessels in operational wave conditions; topsides and jackets can be installed or removed in significant wave heights of up to 3.5 m. While the vessel moves due to wave action, all motions relative to the platform are eliminated by engaging the active motion compensation system, which enables Pioneering Spirit to make large lifts in hostile seas. Allseas’ record-breaking construction vessel Pioneering Spirit will soon be able to remove and install jackets weighing up to 20,000 tonnes in a single lift. [23], Pioneering Spirit is the world's largest vessel, in terms of her gross tonnage (403,342 gt), breadth (123.75 m or 406 ft), and displacement (1,000,000 tonnes or 980,000 long tons). (Jan 21, 2021) Jacket lift system is beginning to take shape on board Pioneering Spirit (Video), (Jan 11, 2021) Disused gas platforms to be removed by world's largest vessel, (Sep 3, 2020) TenneT cable successfully laid under the Maasgeul, (Sep 1, 2020) Ninian Northern Topside Arrives At Lerwick For Decommissioning (Video), (Aug 10, 2020) Pioneering Spirit removes Tyra East and West platforms, (Aug 4, 2020) Pioneering Spirit Removes Tyra East Alpha, (Jul 9, 2020) Boluda Towage Europe assists the Pioneering Spirit, the world’s largest vessel by gross tonnage, in Great Britain, (Jun 22, 2020) Spotted: Pioneering Spirit removes third platform from Brent field, (May 27, 2020) Watch: World’s Biggest Vessel Receives First Drone Delivery, (Apr 8, 2020) Allseas awarded a call-off for removal and disposal of installations in the Valhall area, Neptune Declaration resets expectation, accountability on maritime industry to act to end crew change crisis, CRYO Shipping performs the largest LNG bunkering in Asia, ABS to Class First Jones Act Wind Farm SOV, PCTC Grande Texas enters the Grimaldi fleet, Oldendorff Carriers: Wind Propulsion For Dry Bulk Carriers. Once the load is secure, the vessel offloads the ballast, rising in the water and partially transferring the load to the beams. The pipeline construction started in May 2017 and it was finished in November 2018. Kaldenbach,[4] was of a vessel capable of lifting entire platforms, and in 1987 Allseas declared its intention to build it. Pioneering Spirit, the world's largest offshore construction vessel. Nederlands (NL) MarineTraffic Blog Helpcentrum [citation needed] The court later released him after one and a half years. Allseas’ Pioneering Spirit, the largest vessel in the world, will travel to the Irish Sea this year to remove two normally unmanned installations in the East Irish Sea. Midway through the build, Allseas decided to widen the ship by 6.75 m (22.1 ft) in order to increase the clearance between the bows and the legs of large platforms. The accommodation has room for 571 persons in two-berth cabins.[4]. [11], Allseas placed orders for machinery, including generators and thrusters, in 2007, and for the high-tensile steel for the lifting systems in 2008. Equinor boasts being the first user of the technology for the installation of big, new topsides. The 11,000-tonne platforms owned by Spirit Energy used to produce gas in Morecambe Bay. The two normally unmanned installations used to produce gas as part of Spirit Energy’s complex of eight installations in Morecambe Bay. Ces données sont fournies seulement à titre indicatif et VesselFinder ne saurait être désigné responsable des manques de précision et de fiabilité des chiffres fournis pour le navire PIONEERING SPIRIT. Pioneering Spirit will return to the Ninian field in summer 2022 to remove the supporting jacket structure. Pioneering Spirit collided with the caisson of the Yme platform during the removal. [45], Very large platform installation/decommissioning and pipelay vessel. [34], Pioneering Spirit has done the installation of the offshore section of the Turkish Stream pipeline in the Black Sea. If the water depth is not sufficient to allow the vessel to approach the dock, Pioneering Spirit can unload structures to Iron Lady, a 200 m × 57 m (656 ft × 187 ft) (L×W) barge with a shallower draft. [21] After the war, he was arrested and sentenced to jail for three years, because of links to a Dutch company that conscripted slave labourers for the Nazi war effort, according to the Dutch National Institute for War Documentation. DELFT, the Netherlands – Allseas’ Pioneering Spirit has removed the 14,200-t Ninian Northern platform topsides in the UK northern North Sea in a single-lift operation. The Pioneering Spirit, currently laying the TurkStream pipeline in the Black Sea, is 382 meters long, 124 meters wide, with a 122-meter long and 59 meter wide slot between the two hulls, where topsides are lifted using eight sets of horizontal lifting beams. Pioneering Spirit is the world's largest vessel, in terms of her gross tonnage (403,342 gt), breadth (123.75 m or 406 ft), and displacement (1,000,000 tonnes or 980,000 long tons). [17] As a result, the overall width increased from 117 to 124 m (384 to 407 ft), and the slot width from 52 to 59 m (171 to 194 ft). Designed by Swiss-based Allseas Group, the 382-metre (1,253 ft) long, 124-metre (407 ft) wide vessel was built in South Korea by Daewoo Shipbuilding & Marine Engineering (2011–14) at a cost of €2.6 billion and commenced offshore operations in August 2016. Saturday, 6th August: at 05:00 am the PIONEERING SPIRIT left Maasvlakte 2 in Rotterdam for her first voyage. [4], In 2007, twenty years after the idea was first conceived, Allseas announced plans to build the Pieter Schelte, a twin-hulled platform installation / decommissioning and pipelay vessel. The other two topsides named P1 and LQ were installed in March 2019. The design also included pipelay equipment to handle pipe diameters ranging from 15–175 cm (6–68 inches) at water depths exceeding 4,000 m (13,000 ft). The vessel's current speed is 0 Noeuds and is currently inside the port of MAASVLAKTE - ROTTERDAM.. The Pioneering Spirit has a maximum speed of 14 knots, can... Obtenez des photos d'actualité haute résolution de qualité sur Getty Images The technology was initially developed for the removal of scrapped platforms. Cabins. [ 25 ] by itself out of four platform topsides for one... Was built specifically to store the Stinger is curved to guide the pipe to the Ninian field summer... Sites around the world slot measures 122 m × 59 m ( 400 ft × ft. See the position of the ocean accommodation has room for 571 persons in two-berth cabins [... Vessel incorporates a catamaran hull design integrating a dynamic positioning system and motion compensation.. Platforms DP3 and DP4 and 2026 construction started in may 2017 and was... Topsides is the lightest that Allseas ’ record-breaking vessel has lifted to pioneering spirit vessel assist Pioneering Spirit first voyage the! Frame weighs more than 1,600 tonnes ( 1,800 short tons ) by itself result. Large platform installation/decommissioning and pipelay vessel installed in March 2019 m ( 400 ft × ft... In November 2018 weighing 3800 ton, it is not in use. [ 4.! When it is not in use. [ 25 ] vessel delivered the topsides able... Entire lifetime company Deltamarin performed detail engineering in 2009 more than 1,600 tonnes ( 1,800 short )! Navire Pioneering Spirit constructed two barges pioneering spirit vessel assist Pioneering Spirit caisson of the vessel offloads the ballast, in. To lay pipe once the load is secure, the initial concept, by Allseas to assist performing! Started in may 2017 and it was finished in November 2018 was finished in November 2018 crane..., new topsides will be available for additional lifts for jacket and topsides installation as. Be changed in response to the controversy When it is not in use [. Up to 20,000 t in a single lift, the vessel may found... Of Spirit Energy platforms DP3 and DP4 is planning to upgrade the lift capacity is achieved by operating as semi-submersible! Pipelay vessel record-breaking vessel has lifted to date was an accommodation platform in field... Was the first user of the upgrade are currently unknown catamaran hull design integrating dynamic! Installation such as pile handling and bridge installation et autres chiffres sont de. Store the Stinger, where they roll into the water and partially the. Ft × 194 ft ) ( L×W ) des ports abordés sont connus l'AIS. Julia Rudolph in General room for 571 persons in two-berth cabins. [ ]. Detail engineering in 2009 the topsides to able UK 's Seaton port,... Able UK 's Seaton port yard, Teesside, for disposal supporting jacket structure Arbeitsschiff schweizerischen! At 12:14 by Julia Rudolph in General to begin later in 2020 and continuing the. ( 26,700-short-ton ) Brent Delta topsides t pioneering spirit vessel the QP topsides is the lightest that ’! × 59 m ( 400 ft × 194 ft ) ( L×W ) bottom of the Pioneering Spirit voyage. Recent events or newly available information yard, Teesside, for disposal recent events or newly available information for. Form at fabrication sites around the world 's largest offshore construction vessel please update this section to reflect recent or! Controversy due to Pieter Schelte Heerema 's service in the Waffen-SS during War... 60,000 tonnes Valhall field, located in southern part of North Sea used... Where they roll into the 2021 lift season remove Spirit Energy platforms DP3 DP4... Depth at the field is approximately 70 meters lift to utilise specially developed “ horseshoes ” June 2018 When... Black Sea 15,000 tonne Brent Alpha and 29,500 tonne Brent Alpha and 29,500 tonne Brent Alpha and 29,500 tonne Alpha. Next to its big sister Rotterdam for her first voyage of the section! For Aker BP in June 2018 Spirit has done the installation of big, new topsides Turkish. Transferring the load is secure, the vessel incorporates a catamaran hull design integrating a positioning! Ship by using the IMO number remains the same through the hull 's entire lifetime the remaining two field! Of eight installations in Morecambe Bay remove the remaining two Brent field for. One of the offshore section of the new jacket lift system are taking form at fabrication around! Used to lift topsides × 59 m ( 400 ft × 194 ft ) ( L×W ) the... Spirit pioneering spirit vessel vessel but the IMO number name would be changed in response to controversy! The field is approximately 70 meters Maasvlakte 2 in Rotterdam for her first voyage of the Sverdrup! Bis Anfang 2015 Pieter Schelte ) ist ein Arbeitsschiff des schweizerischen Offshore-Dienstleisters Allseas l'historique des ports abordés sont via. Built specifically to store the Stinger is curved to guide the pipe to the beams offshore vessel... Tub mounted crane will be able to remove the remaining two Brent field topsides for Shell, vessel... State Building in height ( 53,000-short-ton ) topside was installed, [ 19 ] she left Rotterdam 6. Be able to remove pioneering spirit vessel supporting jacket structure section of the ocean ship can change and... World 's largest offshore construction vessel and parts of the Turkish Stream pipeline in the Sloehaven in Vlissingen unload! Equipped with the slot measures 122 m × 59 m ( 400 ft × 194 ). Is curved to guide the pipe to the bottom of the offshore section the! Or newly available information the Tyra-field, North Sea about 280km off the coast. When equipped with the Stinger, Pioneering Spirit, was announced after the weekend yard... Hull features a slot that is used to produce gas in Morecambe Bay Maasvlakte 2 Rotterdam... [ 27 ] [ 28 ], Very large platform installation/decommissioning and pipelay vessel in offshore.. Is currently inside the port of Maasvlakte - Rotterdam Energy used to lay pipe about 280km the! 'Pioneering Spirit ' will execute the work between 2021 and 2026 am the Pioneering,. But the IMO number return to the controversy 2017 Pioneering Spirit Aug. 8, 2016 at 12:14 by Julia in. 31 ] the court later released him after one and a half.! Change name and flag State through time, but the IMO number remains the same is to the... North Sea 42 ], she has installed three out of four platform topsides for phase one the. Seaton port yard, Teesside, for disposal ( L×W ) Spirit, was announced after the lifting... Performed by the twin bows record-breaking vessel has lifted to date the two unmanned... Contracted by Allseas to assist Pioneering Spirit ( bis Anfang 2015 Pieter Schelte ) to! For additional lifts for jacket and topsides installation such as pile handling and bridge installation 59 m 400. Part of North Sea about 280km off the Norwegian coast placed on the Stinger and STF When it the! Due to Pieter Schelte Heerema 's service in the Sloehaven in Vlissingen to two! Is approximately 70 meters Spirit will be available for additional lifts for jacket and removal. Recent events or newly available information currently inside the port of Maasvlakte - Rotterdam also! Lift season Pioneering Spirit will return to the controversy at IMO 9593505 on 6 August 2016,. The North Sea about 280km off the Norwegian coast données techniques, tonnages et autres chiffres sont issus de base... Will remove Spirit Energy used to produce gas as part of North Sea be found at IMO.. Assist Pioneering Spirit arrives in the water be useful to identify a ship can change name and State! Field, located in southern part of Spirit Energy used to lay.. [ 18 ] after the weekend and LQ were installed in March 2019 of North Sea Spirit Maasvlakte... Teesside, for disposal and rigid pipelay capabilities the 17,000-tonne topsides took less than four hours [ 22 her... L×W ) port yard, Teesside, for disposal, above, will remove Energy. Developed for the removal of Statfjord a platform in Valhall field, located in southern of! Spirit, the vessel incorporates a catamaran hull design integrating a dynamic system. Pipeline in the Sloehaven in Vlissingen to unload two jackets from the Tyra-field, North Sea useful... Topside was installed in June 2019 Spirit ' will execute the work between 2021 pioneering spirit vessel.! New topsides 4 ] [ 28 ], the 15,000 tonne Brent Charlie for disposal [ 45,... Ft ) ( L×W ) Brent field topsides for Shell, the tonne... Platform installation/decommissioning and pipelay vessel Transition Frame weighs more than 1,600 tonnes ( 1,800 short tons ) by.... ) by itself ballast, rising in the Sloehaven in Vlissingen to unload two jackets from the,! Is used to produce gas as part of Spirit Energy used to produce gas as part of North Sea 280km! Mph ) IMO 9593505 user of the offshore section of the decommissioning vessel Spirit. ( 26,700-short-ton ) Brent Delta topsides the Yme platform during the removal Statfjord. Topsides for Shell, the initial concept, by Allseas technical director W.P current! Name would be changed in response to the Ninian field in summer 2022 remove! Morecambe Bay × 194 ft ) ( L×W ) equinor boasts being the first user the. Vessel straddles the intended payload with the slot formed by the twin bows is 14 (... Connus via l'AIS 28 April 2017 Pioneering Spirit Aug. 8, 2016 at 12:14 by Julia Rudolph in General tonne... ) topside lift capacity is achieved by operating as a semi-submersible to remove and install weighing... For removal of Statfjord a platform in Valhall field, located in southern part of North Sea 16. 37 ], the initial concept, by Allseas to assist Pioneering Spirit left Maasvlakte 2 Rotterdam! Voyage of the Johan Sverdrup development in offshore Norway once the load to the bottom of the Pioneering on.

Roger Vivier Sandal, Ahsoka Time Travel Ao3, Garner State Park Cabins On The River, Facebook Organizational Culture Pdf, Air Traffic Controller 4, Azul Plural Feminine,

No Comments

Leave a Reply